Talk:SpaceElevatorDeployment: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
(New page: The deployment spacecraft should be largely built with conventional satellite technology. Work needed on the cimber: {| border="1" cellpadding="2" |- |width="200pt"| Item |width="400pt"...) |
(No difference)
|
Revision as of 22:59, 29 June 2008
The deployment spacecraft should be largely built with conventional satellite technology.
Work needed on the cimber:
Item | Notes |
Overall system engineering | Overall satellite constraints and components need to be defined along with the trade-offs for overall performance and subcomponents |
Categorize available electromagnetic propulsion systems of the size required | Define, performance, mass, maturity, cost, |
Examine large scale ribbon spooling techniques | |
Ribbon deployment | dynamics, speed, matching tension in multiple ribons, attaching ribbons end-to-end. |
Overall structure design | Minimize mass, design to handle oscillations, operation in unidirectional gravity field (0 - 0.1G) |
Operations | Work out a detailed operational scenario including fault handling, despooling and speed control |