Talk:SpaceElevatorApplications: Difference between revisions

From SpaceElevatorWiki.com
Jump to navigationJump to search
(New page: The climber has the most engineering work that needs to be done and the most opportunity for individuals and groups to get directly involved. Work needed on the Applications: {| border...)
 
(Removing all content from page)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The climber has the most engineering work that needs to be done and the most opportunity for individuals and groups to get directly involved. 


Work needed on the Applications:
{| border="1" cellpadding="2"
|-
|width="200pt"| Item
|width="400pt"| Notes
|-
|Full review and independent assessment of lunar base proposal || Viability, issues, business or other rational for doing this.
|-
|Full review of Solar Power Satellite concept ||  Realistically do we need SSP?  If so review and evaluate Kellum's work.  Categorize potential sponsors for such a system - Japan, British Petroleum,..., also is manned presence required  if so evaluate geostation viability
|-
|Evaluate tourism potential || Based on current space tourism studies, what is the best business case for tourism with the space elevator - 8 hour trips to LEO, 24 hour trips to LEO, 3 week trips to a GEO station,...?
|-
|Evaluate long-term economic impact of a space elevator for investor/owner || How rich do owners become in various scenarios, how would an elevator affect the builder's economy (U.S., Japan, Germany, Korea, Luxembourg, Saudi Arabia, ...)
|}
[http://keithcu.com/wiki/index.php/SpaceElevatorWikiOverview Return to Overview]

Latest revision as of 07:45, 7 July 2008