SpaceElevatorCost
From SpaceElevatorWiki.com
Budget
The capital construction and operational costs of the space elevator have traditionally been considered a major barrier. Here we will define the budget and determine how it impacts the program.
# of units | Unit cost $M | Tot cost $M | ||
Deployment | Launch costs | 4 | 200 | 800 |
LEO-GEO stage | 4 | 10 | 40 | |
Cable | CNTs ($/kg) | 750000 | 100 | 75 |
interconnects | 1 | 20 | 20 | |
Cable labor | 1 | 100 | 100 | |
Misc. | 100% | 195 | ||
Spacecraft | solar arrays | 150 | 0.01 | 1.5 |
sol arr assemb | 1 | 7 | 7 | |
Struct | 1 | 15 | 15 | |
Cable support | 2 | 25 | 50 | |
cable end mass | 1 | 20 | 20 | |
Design, construction | 1 | 100 | 100 | |
Control | 1 | 50 | 50 | |
braking motors, other | 1 | 10 | 10 | |
Misc | 0% | 0 | ||
Climbers | Struct, Control | 230 | 0.2 | 46 |
Motors | 1100 | 0.05 | 55 | |
Solar cells (m2) | 22,000 | 0.01 | 220 | |
Construct | 230 | 0.2 | 46 | |
Power beam | Station | 3 | 100 | 300 |
laser | 6 | 100 | 600 | |
optics | 6 | 125 | 750 | |
power gen | 4 | 10 | 40 | |
Anchor | Anchor | 1 | 100 | 100 |
Modifications | 1 | 20 | 20 | |
Tracking | Tracking | 1 | 500 | 500 |
Facilities | Megafloat | 1 | 200 | 200 |
1 | 20 | 20 | ||
Other | Admin | 2000 | 0.15 | 300 |
Cont. | 30% | 1404 | ||
Total | 6085 |
Major Development Issues Related to this Component
Additional Work Needed
Item | Notes | Completed and Ongoing Efforts |
Detailed analysis of each subcomponent | Accurate quotes on production of various components | |
Detailed operational costs | Costs based on existing projects of similar scope | File:SE Financial.ods operational budget by Edwards |