SpaceElevatorCost: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
(→Budget) |
|||
Line 3: | Line 3: | ||
The capital construction and operational costs of the space elevator have traditionally been considered a major barrier. Here we will define the budget and determine how it impacts the program. | The capital construction and operational costs of the space elevator have traditionally been considered a major barrier. Here we will define the budget and determine how it impacts the program. | ||
{| border="1" cellpadding="2" | {| border="1" cellpadding="2" | ||
|- | |- align="right" | ||
|width="100pt"| | |width="100pt"| | ||
|width="100pt"| | |width="100pt"| | ||
|width="100pt"| | |width="100pt"| # of units | ||
|width="100pt"| | |width="100pt"|Unit cost $M | ||
|- | |width="100pt"|Tot cost $M | ||
| | |- align="right" | ||
|- | | Deployment|| Launch costs|| 4|| 200|| 800 | ||
| | |- align="right" | ||
|- | | || LEO-GEO stage|| 4|| 10|| 40 | ||
| | |- align="right" | ||
|- | | || || || | ||
| | |- align="right" | ||
|- | | Cable|| CNTs ($/kg) || 750000|| 100|| 75 | ||
|Power | |- align="right" | ||
|- | | || interconnects|| 1|| 20|| 20 | ||
| | |- align="right" | ||
|- | | || Cable labor|| 1|| 100|| 100 | ||
| | |- align="right" | ||
|- | | || Misc.|| 100%|| || 195 | ||
| || | |- align="right" | ||
|- | | || || || | ||
| | |- align="right" | ||
|- | | Spacecraft|| solar arrays|| 150|| 0.01|| 1.5 | ||
| | |- align="right" | ||
|- | | || sol arr assemb|| 1|| 7|| 7 | ||
| | |- align="right" | ||
|- | | || Struct|| 1|| 15|| 15 | ||
| | |- align="right" | ||
|- | | || Cable support|| 2|| 25|| 50 | ||
| | |- align="right" | ||
|- | | || cable end mass|| 1|| 20|| 20 | ||
| | |- align="right" | ||
|- | | || Design, construction|| 1|| 100|| 100 | ||
| | |- align="right" | ||
|- | | || Control|| 1|| 50|| 50 | ||
| | |- align="right" | ||
|- | | || braking motors, other|| 1|| 10|| 10 | ||
| | |- align="right" | ||
|- | | || Misc|| 0%|| || 0 | ||
| | |- align="right" | ||
| || || || | |||
|- align="right" | |||
| Climbers|| Struct, Control|| 230|| 0.2|| 46 | |||
|- align="right" | |||
| || Motors|| 1100|| 0.05|| 55 | |||
|- align="right" | |||
| || Solar cells (m2)|| 22,000|| 0.01|| 220 | |||
|- align="right" | |||
| || Construct|| 230|| 0.2|| 46 | |||
|- align="right" | |||
| || || || | |||
|- align="right" | |||
| Power beam|| Station|| 3|| 100|| 300 | |||
|- align="right" | |||
| || laser|| 6|| 100|| 600 | |||
|- align="right" | |||
| || optics|| 6|| 125|| 750 | |||
|- align="right" | |||
| || power gen|| 4|| 10|| 40 | |||
|- align="right" | |||
| || || || | |||
|- align="right" | |||
| Anchor|| Anchor|| 1|| 100|| 100 | |||
|- align="right" | |||
| || Modifications|| 1|| 20|| 20 | |||
|- align="right" | |||
| || || || | |||
|- align="right" | |||
| Tracking|| Tracking|| 1|| 500|| 500 | |||
|- align="right" | |||
| || || || | |||
|- align="right" | |||
| Facilities|| Megafloat|| 1|| 200|| 200 | |||
|- align="right" | |||
| || || 1|| 20|| 20 | |||
|- align="right" | |||
| Other|| Admin|| 2000|| 0.15|| 300 | |||
|- align="right" | |||
| || Cont.|| 30%|| || 1404 | |||
|- align="right" | |||
| || Total|| || || 6085 | |||
|} | |} | ||
== Major Development Issues Related to this Component == | == Major Development Issues Related to this Component == |
Revision as of 05:28, 16 July 2008
Budget
The capital construction and operational costs of the space elevator have traditionally been considered a major barrier. Here we will define the budget and determine how it impacts the program.
# of units | Unit cost $M | Tot cost $M | ||
Deployment | Launch costs | 4 | 200 | 800 |
LEO-GEO stage | 4 | 10 | 40 | |
Cable | CNTs ($/kg) | 750000 | 100 | 75 |
interconnects | 1 | 20 | 20 | |
Cable labor | 1 | 100 | 100 | |
Misc. | 100% | 195 | ||
Spacecraft | solar arrays | 150 | 0.01 | 1.5 |
sol arr assemb | 1 | 7 | 7 | |
Struct | 1 | 15 | 15 | |
Cable support | 2 | 25 | 50 | |
cable end mass | 1 | 20 | 20 | |
Design, construction | 1 | 100 | 100 | |
Control | 1 | 50 | 50 | |
braking motors, other | 1 | 10 | 10 | |
Misc | 0% | 0 | ||
Climbers | Struct, Control | 230 | 0.2 | 46 |
Motors | 1100 | 0.05 | 55 | |
Solar cells (m2) | 22,000 | 0.01 | 220 | |
Construct | 230 | 0.2 | 46 | |
Power beam | Station | 3 | 100 | 300 |
laser | 6 | 100 | 600 | |
optics | 6 | 125 | 750 | |
power gen | 4 | 10 | 40 | |
Anchor | Anchor | 1 | 100 | 100 |
Modifications | 1 | 20 | 20 | |
Tracking | Tracking | 1 | 500 | 500 |
Facilities | Megafloat | 1 | 200 | 200 |
1 | 20 | 20 | ||
Other | Admin | 2000 | 0.15 | 300 |
Cont. | 30% | 1404 | ||
Total | 6085 |
Major Development Issues Related to this Component
Additional Work Needed
Item | Notes | Completed and Ongoing Efforts |
Detailed analysis of each subcomponent | Accurate quotes on production of various components | |
Detailed operational costs | Costs based on existing projects of similar scope | File:SE Financial.ods operational budget by Edwards |