User:Tetherman: Difference between revisions

From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary
No edit summary
Line 38: Line 38:
!
!
|
|
|            ==========> End of Pay Period 1:  TOTAL TIME FOR:  SEPT=  16 hrs  
|            =======> End of Pay Period 1:  TOTAL TIME FOR:  SEPT=  16 hrs  
|
|
|-
|-
Line 103: Line 103:
!
!
|
|
|            ==========> End of Pay Period 2:  TOTAL TIME FOR:  1OCT -thru- OCT 15 =  67 hrs  
|            =====> End of Pay Period 2:  TOTAL TIME FOR:  1OCT -thru- OCT 15 =  67 hrs  
|
|
|-
|-
Line 173: Line 173:
!
!
|
|
|            ==========> End of Pay Period 3:  TOTAL TIME FOR:  1 OCT -thru- 31 OCT =  XX hrs  
|            =====> End of Pay Period 3:  TOTAL TIME FOR:  1 OCT -thru- 31 OCT =  XX hrs  
|
|
|-
|-

Revision as of 17:56, 31 October 2008

Activities for Dave Lang

Date Time Tasks
2008_Sep_23 1.5_hrs Looking into Ubuntu and open source Fortrans
2008-Sep-24 0.5 hrs Communication/Admin; Mac Intel PC Virtual Machine exploration
2008-Sep-25 1.0 hrs Getting PC Virtual Machine "VMware Fusion"; Install and set-up configurations
2008-Sep-26 1.5 hrs Download and Install Ubuntu; Problems encountered with VMware-Fusion & Ubuntu windows; Looking into changing to Parallels VM for Mac
2008-Sep-27 3.5 hrs Download Parallels; Familization with installation and configuration; Identifying choice of Open source Fortran 95; Some Python education
2008-Sep-29 3.0 hrs Install Parallels VM on Mac; Exploring Python and Array Pointers
2008-Sep-30 5.0 hrs Install and Configure Ubuntu under Parallels; Bringing up Ubuntu desktop; Figuring out VM Ubuntu-to-Mac file transfer procedure.
=======> End of Pay Period 1: TOTAL TIME FOR: SEPT= 16 hrs
2008-Oct-1 2.0 hrs Establishing and testing Ubuntu/GTOSS inter-machine file transfer path options
2008-Oct-3 1.5 hrs Move GTOSS source to Ubuntu; Download GNU "g95 Fortran"
2008-Oct-4 3.0 hrs Figuring out g95 Fortran installation; Linux System admin stuff
2008-Oct-5 6.0 hrs Business Admin; Setting up Fortran installation; Solving configuragtion difficulties
2008-Oct-6 7.5 hrs Solved config problem(s), g95 now executes; Dealing w/GNU-vs-Absoft Fortran idiosyncracies; Successful compile of GTOSS; entering Makefile/Config purgatory (but not Hell); Successful "makes" of all GTOSS apps
2008-Oct-7 4.5 hrs Brought-up "GTOSS-verification scripts" under Ubuntu; Wrestling with g95 application "segmentation faults"; Exploring Python vers for Mac
2008-Oct-8 4.5 hrs Chasing Seg Fault problem.
2008-Oct-9 6.5 hrs Seg Fault solved; Ubuntu GTOSS execution verified; Preparing Ubuntu GTOSS install manual; Preparing GTOSS distribution files
2008-Oct-10 2.5 hrs Developing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs; Exploring Python Object Oriented features
2008-Oct-11 3.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs
2008-Oct-12 6.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Setting up Intel-Ubuntu PC
2008-Oct-13 7.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Exploring g95 compiler for Kubuntu on Intel PC
2008-Oct-14 9.5 hours Preparing Ubuntu GTOSS "Getting Started" manual; Creating sample SE run for users; Installing g95 compiler; porting GTOSS to Kubuntu (text-case hell); GTOSS complex successfully compiled & verified
2008-Oct-15 2.0 hours Preparing Ubuntu GTOSS "Getting Started" manual; Resolved porting-text issue; Creating sample SE run for users;
=====> End of Pay Period 2: TOTAL TIME FOR: 1OCT -thru- OCT 15 = 67 hrs
2008-Oct-16 6.0 hours Installing OpenOffice; Word->ODT conversion HELL; SE Runs for User delivery
2008-Oct-17 6.5 hours Used Acrobat to do .pdf doc conversions; Finished GTOSS docs for Wiki; Finishing user-run definitions; Python Conversion thoughts
2008-Oct-18 3.5 hours Going over design notes for GTOSS v2; Finished Wiki SE user-run defs;
2008-Oct-19 6.0 hours Added additional SE runs for Users (total of 35 SE runs/descriptions); GTOSS v2 design notes familiarization
2008-Oct-20 7.0 hours Final overview of Ubuntu delivery package; Meeting with Keith
2008-Oct-21 3.5 hours Python familiarization; exploring F2YP
2008-Oct-22 2.5 hours Python familiarization; identified 3 ways to do Fortran-Pyhton-Interface-Generaton(FPIG); Identified winning FGIP
2008-Oct-23 2.0 hours Mercurial familiarization; upgrading Mac Python to 2.5.2; installing Mercurial;
2008-Oct-25 2.5 hours Attempting SS GTOSS repository update; F2Py explorations
2008-Oct-26 3.0 hours Finished SS Archive education!; Trying to find proper PyTables/HDF5 install scheme;
2008-Oct-27 2.5 hours Python familiarization; Python-Fortran testbed development
2008-Oct-28 3.5 hours Python-Fortran test development; Setting up Python/GTOSS development structure; Troubleshooting f2py
2008-Oct-29 3.5 hours Reading f2py References, etc; Re-installed Python-complex, now f2py + everything else works
2008-Oct-30 1.5 hours Successfully generated f2py C-code; Troubleshooting C-library-issues created by f2py C-code wrapper output
2008-Oct-31 XXX hours xxxxxxxxxxxxxxxxxxxxxxxxxxxx
=====> End of Pay Period 3: TOTAL TIME FOR: 1 OCT -thru- 31 OCT = XX hrs
XXX hours xxxxxxxxxxxxxxxxxxxxxxxxxxxx