Activities for '''Dave Lang'''
Activities for '''Dave Lang'''


{| cellspacing="0" border="1" cellpadding="2"
{| cellspacing="1" border="2" cellpadding="2"
!Date
!Date
!Time
!Time
!Tasks
!Tasks
|-
|-
!2008-Sep-23
!2008_Sep_23
|1.5 hours
|1.5_hrs
|Looking into Ubuntu and open source Fortrans
|Looking into Ubuntu and open source Fortrans
|-
|-
!2008-Sep-24
!2008-Sep-24
|0.5 hours
|0.5 hrs
|Communication/Admin;  Mac Intel  PC Virtual Machine exploration
|Communication/Admin;  Mac Intel  PC Virtual Machine exploration
|-
|-
!2008-Sep-25
!2008-Sep-25
|1.0 hours
|1.0 hrs
|Getting PC Virtual Machine "VMware Fusion";  Install and set-up configurations
|Getting PC Virtual Machine "VMware Fusion";  Install and set-up configurations
|-
|-
!2008-Sep-26
!2008-Sep-26
|1.5 hours
|1.5 hrs
|Download and Install Ubuntu;  Problems encountered with VMware-Fusion & Ubuntu windows;  Looking into changing to Parallels VM for Mac  
|Download and Install Ubuntu;  Problems encountered with VMware-Fusion & Ubuntu windows;  Looking into changing to Parallels VM for Mac  
|-
|-
!2008-Sep-27
!2008-Sep-27
|3.5 hours
|3.5 hrs
|Download Parallels;  Familization with installation and configuration;  Identifying choice of Open source Fortran 95; Some Python education
|Download Parallels;  Familization with installation and configuration;  Identifying choice of Open source Fortran 95; Some Python education
|-
|-
!2008-Sep-29
!2008-Sep-29
|3.0 hours
|3.0 hrs
|Install Parallels VM on Mac;  Exploring Python and Array Pointers
|Install Parallels VM on Mac;  Exploring Python and Array Pointers
|-
|-
!2008-Sep-30
!2008-Sep-30
|5.0 hours
|5.0 hrs
|Install and Configure Ubuntu under Parallels;  Bringing up Ubuntu desktop; Figuring out VM Ubuntu-to-Mac file transfer procedure.  
|Install and Configure Ubuntu under Parallels;  Bringing up Ubuntu desktop; Figuring out VM Ubuntu-to-Mac file transfer procedure.  
|-
|-
Line 38: Line 38:
!
!
|
|
|                           ==========> TOTAL TIME IN SEPTEMBER  End of Pay Period:  Time Spent =  16 hrs  
|             ======> End of Pay Period 1TOTAL Time for SEPT=  16 hrs  
|
|
|-
|-
Line 44: Line 44:
|-
|-
!2008-Oct-1
!2008-Oct-1
|2.0 hours
|2.0 hrs
|Establishing and testing Ubuntu/GTOSS inter-machine file transfer path options
|Establishing and testing Ubuntu/GTOSS inter-machine file transfer path options
|-
|-
!2008-Oct-3
!2008-Oct-3
|1.5 hours
|1.5 hrs
|Move GTOSS source to Ubuntu;  Download GNU "g95 Fortran"
|Move GTOSS source to Ubuntu;  Download GNU "g95 Fortran"
|-
|-
!2008-Oct-4
!2008-Oct-4
|3.0 hours
|3.0 hrs
|Figuring out g95 Fortran installation;  Linux System admin stuff
|Figuring out g95 Fortran installation;  Linux System admin stuff
|-
|-
!2008-Oct-5
!2008-Oct-5
|6.0 hours
|6.0 hrs
|Business Admin; Setting up Fortran installation; Solving configuragtion difficulties
|Business Admin; Setting up Fortran installation; Solving configuragtion difficulties
|-
|-
!2008-Oct-6
!2008-Oct-6
|7.5 hours
|7.5 hrs
|Solved config problem(s), g95 now executes; Dealing w/GNU-vs-Absoft Fortran idiosyncracies; Successful compile of GTOSS; entering Makefile/Config purgatory (but not Hell); Successful "makes" of all GTOSS apps   
|Solved config problem(s), g95 now executes; Dealing w/GNU-vs-Absoft Fortran idiosyncracies; Successful compile of GTOSS; entering Makefile/Config purgatory (but not Hell); Successful "makes" of all GTOSS apps   
|-
|-
!2008-Oct-7
!2008-Oct-7
|4.5 hours
|4.5 hrs
|Brought-up "GTOSS-verification scripts" under Ubuntu; Wrestling with g95 application "segmentation faults";  Exploring Python vers for Mac
|Brought-up "GTOSS-verification scripts" under Ubuntu; Wrestling with g95 application "segmentation faults";  Exploring Python vers for Mac
|-
|-
!2008-Oct-8
!2008-Oct-8
|4.5 hours
|4.5 hrs
|Chasing Seg Fault problem.
|Chasing Seg Fault problem.
|-
|-
!2008-Oct-9
!2008-Oct-9
|6.5 hours
|6.5 hrs
|Seg Fault solved;  Ubuntu GTOSS execution verified; Preparing Ubuntu GTOSS install manual;  Preparing GTOSS distribution files
|Seg Fault solved;  Ubuntu GTOSS execution verified; Preparing Ubuntu GTOSS install manual;  Preparing GTOSS distribution files
|-
|-
!2008-Oct-10
!2008-Oct-10
|2.5 hours
|2.5 hrs
|Developing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs; Exploring Python Object Oriented features
|Developing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs; Exploring Python Object Oriented features
|-
|-
!2008-Oct-11
!2008-Oct-11
|3.5 hours
|3.5 hrs
|Preparing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs
|Preparing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs
|-
|-
!2008-Oct-12
!2008-Oct-12
|6.5 hours
|6.5 hrs
|Preparing Ubuntu GTOSS "Getting Started" manual; Setting up Intel-Ubuntu PC
|Preparing Ubuntu GTOSS "Getting Started" manual; Setting up Intel-Ubuntu PC
|-
|-
!2008-Oct-13
!2008-Oct-13
|7.5 hours
|7.5 hrs
|Preparing Ubuntu GTOSS "Getting Started" manual; Exploring g95 compiler for Kubuntu on Intel PC
|Preparing Ubuntu GTOSS "Getting Started" manual; Exploring g95 compiler for Kubuntu on Intel PC
|-
|-
!2008-Oct-14
!2008-Oct-14
|XX hours
|9.5 hrs
|xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
|Preparing Ubuntu GTOSS "Getting Started" manual; Creating sample SE run for users; Installing g95 compiler; porting GTOSS to Kubuntu (text-case hell); GTOSS complex successfully compiled & verified
|-
|-
!2008-Oct-15
!2008-Oct-15
|XX hours
|2.0 hrs
|xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
|Preparing Ubuntu GTOSS "Getting Started" manual; Resolved porting-text issue; Creating sample SE run for users;
|-
|-
!
!
|-
!
|
|            =====> End of Pay Period 2:  TOTAL Time for 1 OCT thru 15 OCT =  67 hrs
|
|
|             ==========>  TOTAL TIME IN SEPTEMBER  End of Pay Period:  2  Time Spent =  xx hrs
|-
|
|
|-
|-
!2008-Oct-16
|6.0 hrs
|Installing OpenOffice; Word->ODT conversion HELL;  SE Runs for User delivery
|-
!2008-Oct-17
|6.5 hrs
|Used Acrobat to do .pdf doc conversions; Finished GTOSS docs for Wiki;  Finishing user-run definitions; Python Conversion thoughts
|-
!2008-Oct-18
|3.5 hrs
|Going over design notes for GTOSS v2; Finished Wiki SE user-run defs;
|-
!2008-Oct-19
|6.0 hrs
|Added additional SE runs for Users (total of 35 SE runs/descriptions);  GTOSS v2 design notes familiarization
|-
!2008-Oct-20
|7.0 hrs
|Final overview of Ubuntu delivery package; Meeting with Keith
|-
!2008-Oct-21
|3.5 hrs
|Python familiarization; exploring F2YP
|-
!2008-Oct-22
|2.5 hrs
|Python familiarization; identified 3 ways to do Fortran-Pyhton-Interface-Generaton(FPIG); Identified winning FGIP
|-
!2008-Oct-23
|2.0 hrs
|Mercurial familiarization; upgrading Mac Python to 2.5.2; installing Mercurial; 
|-
!2008-Oct-25
|2.5 hrs
|Attempting SS GTOSS repository update;  F2Py explorations
|-
!2008-Oct-26
|3.0 hrs
|Finished SS Archive education!; Trying to find proper PyTables/HDF5 install scheme; 
|-
!2008-Oct-27
|2.5 hrs
|Python familiarization; Python-Fortran testbed development
|-
!2008-Oct-28
|3.5 hrs
|Python-Fortran test development;  Setting up Python/GTOSS development structure; Troubleshooting f2py
|-
!2008-Oct-29
|3.5 hrs
|Reading f2py References, etc; Re-installed Python-complex, now f2py + everything else works
|-
!2008-Oct-30
|1.5 hrs
|Successfully generated f2py C-code; Troubleshooting C-library-issues created by f2py C-code wrapper output
|-
!2008-Oct-31
|3.0 hrs
|Troubleshooting C/Fortran compile library-issues created by f2py C-code wrapper output; C-code makefile issues
|-
!
|-
!
|
|            =====> End of Pay Period 3:  TOTAL Time for 15 OCT thru 31 OCT =  56.5 hrs
|
|-
|
|-
!2008-Nov-01
|0 hrs
|No activity; chill-out contemplating problem!
|-
!2008-Nov-02
|0.0 hrs
|No activity - chill out, contemplating problem
|-
!!2008-Nov-03
|1.5 hrs
|Exploring f2py C-compile connundrum
|-
!2008-Nov-04
|2.5 hrs
|Exploring f2py C-compile connundrum;  Learning about PyTables
|-
!2008-Nov-05
|2.0 hrs
|Exploring f2py C-compile connundrum;  Learning about PyTables
|-
!2008-Nov-06
|5.5 hrs
|Solved f2py compile connundrum; Python-to-Fortran connection successful; Learning about PyTables
|-
!2008-Nov-07
|3.0 hrs
|Exploring Fortran->Python Call-back;  Learning about PyTables
|-
!2008-Nov-08
|6.5 hrs
|Troubleshooting Fortran->Python Call-back scheme
|-
!2008-Nov-09
|0.0 hrs
|No Activity
|-
!2008-Nov-10
|5.5 hrs
|Troubleshooting Fortran->Python Call-back scheme
|-
!2008-Nov-11
|3.5 hrs
|Troubleshooting Fortran->Python Call-back scheme
|-
!2008-Nov-12
|3.5 hrs
|Exploring NumPy;  Troubleshooting Fortran->Python Call-back scheme
|-
!2008-Nov-13
|0.0 hrs
|No activity - chill out, contemplating problem
|-
!2008-Nov-14
|0.0 hrs
|No activity - chill out, contemplating problem
|-
!2008-Nov-15
|3.0 hrs
|Resolved the Fortran->Python Call-back scheme!!!!
|-
!
|-
!
|
|            =====> End of Pay Period 4:  TOTAL Time for 1 Nov thru 15 Nov =  36.5 hrs
|
|
|-
|
|
|-
|-
!2008-Oct-16
!2008-Nov-16
|XX hours
|0.0 hrs
|xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
|No activity
|-
!2008-Nov-17
|2.5 hrs
|Mocking-up more complex GTOSS-Python logical exection flow to test f2py wrap/call-back
|-
!2008-Nov-18
|6.5 hrs
|Dealing with wrap/call-back issues in GTOSS-Python logical exection flow; problem solved!!
|-
!2008-Nov-19
|1.5 hrs
|Mocking-up more complex GTOSS-Python logical exection flow;
|-
!2008-Nov-20
|5.5 hrs
|Going over f2py docs to figure out how to do complex wrap; Meeting with Curtis
|-
!2008-Nov-21
|0.0 hrs
|No Activity; contemplating next approach
|-
!2008-Nov-22
|5.0 hrs
|Successfully mocked-up more complex GTOSS-Python logical structure; Preparing SE movie Wiki package
|-
!2008-Nov-23
|8.0 hrs
|Configuring GTOSS sources/makefile to produce f2py-friendly structure; Preparing SE movie Wiki package
|-
!2008-Nov-24
|0.0 hrs
|No Activity; contemplating f2py issues
|-
!2008-Nov-25
|6.5 hrs
|Re-Configured GTOSS sources/makefile to produce f2py-friendly structure; Wrestling with f2py issues
|-
!2008-Nov-26
|2.5 hrs
|Wrestling with f2py issues;
|-
!2008-Nov-27
|2.0 hrs
|Wrestling with f2py issues;
|-
!2008-Nov-28
|2.0 hrs
|Wrestling with f2py issues;  Preparing SE movie Wiki package
|-
!2008-Nov-29
|5.0 hrs
|Wrestling with f2py issues;  Preparing SE movie Wiki package
|-
!2008-Nov-30
|3.0 hrs
|Still Wrestling with f2py issues....exploring alternate approach!
|-
!
|-
!
|
|            =====> End of Pay Period 5:  TOTAL Time for 15 Nov thru 30 Nov =  50.0 hrs
|
|-
|
|-
!2008-Dec-01
|5.0 hrs
|Still Wrestling with f2py issues; Formulating alternative approach!
|-
!2008-Dec-02
|2.0 hrs
|Exploring HDF5 and JSON; Meeting with Keith
|-
!2008-Dec-03
|3.0 hrs
|Determined JSON convert times; Exploring HDF5 for gfortran
|-
!2008-Dec-04
|3.5 hrs
|Organizing movies for Wiki; Exploring HDF5 for Fortran
|-
!2008-Dec-05
|3.0 hrs
|Organizing movies for Wiki; Exploring HDF5 for Fortran
|-
!2008-Dec-06
|6.5 hrs
|Organizing f2py test bed; additional f2py explorations
|-
!2008-Dec-07
|4.0 hrs
|Additional f2py explorations
|-
!2008-Dec-08
|2.0 hrs
|Additional f2py explorations; attempting HDF5 Fortran setup
|-
!2008-Dec-09
|4.5 hrs
|Additional f2py explorations; attempting HDF5 Fortran setup
|-
!2008-Dec-10
|4.5 hrs
|Additional f2py explorations; HDF5 Fortran testing
|-
!2008-Dec-11
|1.5 hrs
|HDF5 Fortran testing, Exploring Wiki to install movies.
|-
!2008-Dec-12
|0.0 hrs
|No activity
|-
!2008-Dec-13
|0.0 hrs
|No activity
|-
!2008-Dec-14
|1.5 hrs
|f2py exploration; HDF5 work
|-
!2008-Dec-15
|6.5 hrs
|Wiki development; f2py re-prise.
|-
!2008-Dec-16
|4.5 hrs
|Wiki development
|-
!2008-Dec-17
|4.0 hrs
|Wiki development; HDF work
|-
!2008-Dec-18
|5.0 hrs
|Wiki development; Ubuntu HDF linking issues
|-
!2008-Dec-19
|2.0 hrs
|Wiki development; Ubuntu HDF linking issues
|-
!2008-Dec-20
|2.0 hrs
|Wiki development
|-
!2008-Dec-21
|1.5 hrs
|Wiki development
|-
!2008-Dec-22
|6.0 hrs
|Wiki development
|-
!2008-Dec-23
|2.5 hrs
|Wiki development
|-
 
!2008-Dec-24
|0.0 hrs
|No activity
|-
!2008-Dec-25
|0.0 hrs
|No activity
|-
!2008-Dec-26
|3.0 hrs
|Wiki development; HDF5 work
|-
!2008-Dec-27
|5.5 hrs
|HDF5 work; Setting up Python effort
|-
!2008-Dec-28
|2.0 hrs
|Numpy/PyTables refresher for designing GTOSS data structures;
|-
!2008-Dec-29
|4.0 hrs
|Numpy/PyTables refresher for designing GTOSS data structures;
|-
!2008-Dec-30
|5.0 hrs
|Meeting with Keith
|-
!2008-Dec-31
|0.0 hrs
|No activity
|-
!
|-
!
|
|            =====> End of Pay Period 6:  TOTAL Time for 1 Dec thru 31 Dec 08 =  94.5 hrs
|
|-
|
|-
!2009-Jan-01
|0.0 hrs
|No activity
|-
!...  Thru ...
|
|
|-
!2009-Jan-14
|0.0 hrs
|No activity
|-
!2009-Jan-15
|0.0 hrs
|xxxxxxxxxx
|-
|-
|}
|}

Latest revision as of 21:24, 14 January 2009

Activities for Dave Lang

Date Time Tasks
2008_Sep_23 1.5_hrs Looking into Ubuntu and open source Fortrans
2008-Sep-24 0.5 hrs Communication/Admin; Mac Intel PC Virtual Machine exploration
2008-Sep-25 1.0 hrs Getting PC Virtual Machine "VMware Fusion"; Install and set-up configurations
2008-Sep-26 1.5 hrs Download and Install Ubuntu; Problems encountered with VMware-Fusion & Ubuntu windows; Looking into changing to Parallels VM for Mac
2008-Sep-27 3.5 hrs Download Parallels; Familization with installation and configuration; Identifying choice of Open source Fortran 95; Some Python education
2008-Sep-29 3.0 hrs Install Parallels VM on Mac; Exploring Python and Array Pointers
2008-Sep-30 5.0 hrs Install and Configure Ubuntu under Parallels; Bringing up Ubuntu desktop; Figuring out VM Ubuntu-to-Mac file transfer procedure.
======> End of Pay Period 1: TOTAL Time for SEPT= 16 hrs
2008-Oct-1 2.0 hrs Establishing and testing Ubuntu/GTOSS inter-machine file transfer path options
2008-Oct-3 1.5 hrs Move GTOSS source to Ubuntu; Download GNU "g95 Fortran"
2008-Oct-4 3.0 hrs Figuring out g95 Fortran installation; Linux System admin stuff
2008-Oct-5 6.0 hrs Business Admin; Setting up Fortran installation; Solving configuragtion difficulties
2008-Oct-6 7.5 hrs Solved config problem(s), g95 now executes; Dealing w/GNU-vs-Absoft Fortran idiosyncracies; Successful compile of GTOSS; entering Makefile/Config purgatory (but not Hell); Successful "makes" of all GTOSS apps
2008-Oct-7 4.5 hrs Brought-up "GTOSS-verification scripts" under Ubuntu; Wrestling with g95 application "segmentation faults"; Exploring Python vers for Mac
2008-Oct-8 4.5 hrs Chasing Seg Fault problem.
2008-Oct-9 6.5 hrs Seg Fault solved; Ubuntu GTOSS execution verified; Preparing Ubuntu GTOSS install manual; Preparing GTOSS distribution files
2008-Oct-10 2.5 hrs Developing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs; Exploring Python Object Oriented features
2008-Oct-11 3.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs
2008-Oct-12 6.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Setting up Intel-Ubuntu PC
2008-Oct-13 7.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Exploring g95 compiler for Kubuntu on Intel PC
2008-Oct-14 9.5 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Creating sample SE run for users; Installing g95 compiler; porting GTOSS to Kubuntu (text-case hell); GTOSS complex successfully compiled & verified
2008-Oct-15 2.0 hrs Preparing Ubuntu GTOSS "Getting Started" manual; Resolved porting-text issue; Creating sample SE run for users;
=====> End of Pay Period 2: TOTAL Time for 1 OCT thru 15 OCT = 67 hrs
2008-Oct-16 6.0 hrs Installing OpenOffice; Word->ODT conversion HELL; SE Runs for User delivery
2008-Oct-17 6.5 hrs Used Acrobat to do .pdf doc conversions; Finished GTOSS docs for Wiki; Finishing user-run definitions; Python Conversion thoughts
2008-Oct-18 3.5 hrs Going over design notes for GTOSS v2; Finished Wiki SE user-run defs;
2008-Oct-19 6.0 hrs Added additional SE runs for Users (total of 35 SE runs/descriptions); GTOSS v2 design notes familiarization
2008-Oct-20 7.0 hrs Final overview of Ubuntu delivery package; Meeting with Keith
2008-Oct-21 3.5 hrs Python familiarization; exploring F2YP
2008-Oct-22 2.5 hrs Python familiarization; identified 3 ways to do Fortran-Pyhton-Interface-Generaton(FPIG); Identified winning FGIP
2008-Oct-23 2.0 hrs Mercurial familiarization; upgrading Mac Python to 2.5.2; installing Mercurial;
2008-Oct-25 2.5 hrs Attempting SS GTOSS repository update; F2Py explorations
2008-Oct-26 3.0 hrs Finished SS Archive education!; Trying to find proper PyTables/HDF5 install scheme;
2008-Oct-27 2.5 hrs Python familiarization; Python-Fortran testbed development
2008-Oct-28 3.5 hrs Python-Fortran test development; Setting up Python/GTOSS development structure; Troubleshooting f2py
2008-Oct-29 3.5 hrs Reading f2py References, etc; Re-installed Python-complex, now f2py + everything else works
2008-Oct-30 1.5 hrs Successfully generated f2py C-code; Troubleshooting C-library-issues created by f2py C-code wrapper output
2008-Oct-31 3.0 hrs Troubleshooting C/Fortran compile library-issues created by f2py C-code wrapper output; C-code makefile issues
=====> End of Pay Period 3: TOTAL Time for 15 OCT thru 31 OCT = 56.5 hrs
2008-Nov-01 0 hrs No activity; chill-out contemplating problem!
2008-Nov-02 0.0 hrs No activity - chill out, contemplating problem
!2008-Nov-03 1.5 hrs Exploring f2py C-compile connundrum
2008-Nov-04 2.5 hrs Exploring f2py C-compile connundrum; Learning about PyTables
2008-Nov-05 2.0 hrs Exploring f2py C-compile connundrum; Learning about PyTables
2008-Nov-06 5.5 hrs Solved f2py compile connundrum; Python-to-Fortran connection successful; Learning about PyTables
2008-Nov-07 3.0 hrs Exploring Fortran->Python Call-back; Learning about PyTables
2008-Nov-08 6.5 hrs Troubleshooting Fortran->Python Call-back scheme
2008-Nov-09 0.0 hrs No Activity
2008-Nov-10 5.5 hrs Troubleshooting Fortran->Python Call-back scheme
2008-Nov-11 3.5 hrs Troubleshooting Fortran->Python Call-back scheme
2008-Nov-12 3.5 hrs Exploring NumPy; Troubleshooting Fortran->Python Call-back scheme
2008-Nov-13 0.0 hrs No activity - chill out, contemplating problem
2008-Nov-14 0.0 hrs No activity - chill out, contemplating problem
2008-Nov-15 3.0 hrs Resolved the Fortran->Python Call-back scheme!!!!
=====> End of Pay Period 4: TOTAL Time for 1 Nov thru 15 Nov = 36.5 hrs
2008-Nov-16 0.0 hrs No activity
2008-Nov-17 2.5 hrs Mocking-up more complex GTOSS-Python logical exection flow to test f2py wrap/call-back
2008-Nov-18 6.5 hrs Dealing with wrap/call-back issues in GTOSS-Python logical exection flow; problem solved!!
2008-Nov-19 1.5 hrs Mocking-up more complex GTOSS-Python logical exection flow;
2008-Nov-20 5.5 hrs Going over f2py docs to figure out how to do complex wrap; Meeting with Curtis
2008-Nov-21 0.0 hrs No Activity; contemplating next approach
2008-Nov-22 5.0 hrs Successfully mocked-up more complex GTOSS-Python logical structure; Preparing SE movie Wiki package
2008-Nov-23 8.0 hrs Configuring GTOSS sources/makefile to produce f2py-friendly structure; Preparing SE movie Wiki package
2008-Nov-24 0.0 hrs No Activity; contemplating f2py issues
2008-Nov-25 6.5 hrs Re-Configured GTOSS sources/makefile to produce f2py-friendly structure; Wrestling with f2py issues
2008-Nov-26 2.5 hrs Wrestling with f2py issues;
2008-Nov-27 2.0 hrs Wrestling with f2py issues;
2008-Nov-28 2.0 hrs Wrestling with f2py issues; Preparing SE movie Wiki package
2008-Nov-29 5.0 hrs Wrestling with f2py issues; Preparing SE movie Wiki package
2008-Nov-30 3.0 hrs Still Wrestling with f2py issues....exploring alternate approach!
=====> End of Pay Period 5: TOTAL Time for 15 Nov thru 30 Nov = 50.0 hrs
2008-Dec-01 5.0 hrs Still Wrestling with f2py issues; Formulating alternative approach!
2008-Dec-02 2.0 hrs Exploring HDF5 and JSON; Meeting with Keith
2008-Dec-03 3.0 hrs Determined JSON convert times; Exploring HDF5 for gfortran
2008-Dec-04 3.5 hrs Organizing movies for Wiki; Exploring HDF5 for Fortran
2008-Dec-05 3.0 hrs Organizing movies for Wiki; Exploring HDF5 for Fortran
2008-Dec-06 6.5 hrs Organizing f2py test bed; additional f2py explorations
2008-Dec-07 4.0 hrs Additional f2py explorations
2008-Dec-08 2.0 hrs Additional f2py explorations; attempting HDF5 Fortran setup
2008-Dec-09 4.5 hrs Additional f2py explorations; attempting HDF5 Fortran setup
2008-Dec-10 4.5 hrs Additional f2py explorations; HDF5 Fortran testing
2008-Dec-11 1.5 hrs HDF5 Fortran testing, Exploring Wiki to install movies.
2008-Dec-12 0.0 hrs No activity
2008-Dec-13 0.0 hrs No activity
2008-Dec-14 1.5 hrs f2py exploration; HDF5 work
2008-Dec-15 6.5 hrs Wiki development; f2py re-prise.
2008-Dec-16 4.5 hrs Wiki development
2008-Dec-17 4.0 hrs Wiki development; HDF work
2008-Dec-18 5.0 hrs Wiki development; Ubuntu HDF linking issues
2008-Dec-19 2.0 hrs Wiki development; Ubuntu HDF linking issues
2008-Dec-20 2.0 hrs Wiki development
2008-Dec-21 1.5 hrs Wiki development
2008-Dec-22 6.0 hrs Wiki development
2008-Dec-23 2.5 hrs Wiki development
2008-Dec-24 0.0 hrs No activity
2008-Dec-25 0.0 hrs No activity
2008-Dec-26 3.0 hrs Wiki development; HDF5 work
2008-Dec-27 5.5 hrs HDF5 work; Setting up Python effort
2008-Dec-28 2.0 hrs Numpy/PyTables refresher for designing GTOSS data structures;
2008-Dec-29 4.0 hrs Numpy/PyTables refresher for designing GTOSS data structures;
2008-Dec-30 5.0 hrs Meeting with Keith
2008-Dec-31 0.0 hrs No activity
=====> End of Pay Period 6: TOTAL Time for 1 Dec thru 31 Dec 08 = 94.5 hrs
2009-Jan-01 0.0 hrs No activity
... Thru ...
2009-Jan-14 0.0 hrs No activity
2009-Jan-15 0.0 hrs xxxxxxxxxx