From SpaceElevatorWiki.com
Jump to navigationJump to search
|
|
(One intermediate revision by one other user not shown) |
Line 1: |
Line 1: |
| The deployment spacecraft should be largely built with conventional satellite technology.
| |
|
| |
|
| Work needed on the cimber:
| |
|
| |
| {| border="1" cellpadding="2"
| |
| |-
| |
| |width="200pt"| Item
| |
| |width="400pt"| Notes
| |
| |-
| |
| |Overall system engineering || Overall satellite constraints and components need to be defined along with the trade-offs for overall performance and subcomponents
| |
| |-
| |
| |Categorize available electromagnetic propulsion systems of the size required || Define, performance, mass, maturity, cost,
| |
| |-
| |
| |Examine large scale ribbon spooling techniques ||
| |
| |-
| |
| |Ribbon deployment || dynamics, speed, matching tension in multiple ribons, attaching ribbons end-to-end.
| |
| |-
| |
| |Overall structure design || Minimize mass, design to handle oscillations, operation in unidirectional gravity field (0 - 0.1G)
| |
| |-
| |
| |Operations || Work out a detailed operational scenario including fault handling, despooling and speed control
| |
| |}
| |
|
| |
| [http://keithcu.com/wiki/index.php/SpaceElevatorWikiOverview Return to Overview]
| |
Latest revision as of 07:44, 7 July 2008