SpaceElevatorDeployment

From SpaceElevatorWiki.com
Revision as of 07:05, 3 July 2008 by Edwards (talk | contribs)
Jump to navigationJump to search

The Deployment

Deploying the ribbon takes innovation and care. The ribbon can not be simply thrown up into space neither can it be blindly dropped down from orbit. The deployment spacecraft is to deliver the first ribbon then climbers will build up and strengthen the ribbon to the point where it is usable.


Value Units
Spacecraft Mass 80 tons
Mass of first ribbon 40 meters
Fisrt climber size 1 ton
Spacecraft propoulsion MPD
Power source MW of beamed power
Deployment time for first ribbon 2 weeks



Status:

Large Spacecraft have been built and operated Need additional work on launching first ribbonInclude images and videos Include design write-ups


Return to Overview