RibbonSplicing: Difference between revisions

From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary
No edit summary
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<div style="float:right; border:#CCCCCC solid 1px; background-color: #F7F7F7">
<table cellspacing=0 cellpadding=0 width=550>
<tr><td colspan="3" align="center" style="background-color:#CCCCCC"><b>Title:</b> Ribbon Splicing</td></tr>
<tr>
<td align="center" valign="middle" height=125 width=100 style='padding:10px'>
<div style="background-color:#CCCCFF; height:110px; width:90px">
[Cover Img]
</div>
</td>
<td align="left" valign="top">
<div>
<b>About:</b><br />
* Moderator: [[RibbonSplicing#edwards|Brad Edwards]]<br />
* Created: July 6, 2008<br />
* Modified: July 25, 2008<br />
</div>
</td>
<td align="left" valign="top">
<div>
'''[[Article Tags|Tags]]''':<br />
* This is a collaborative article<br />
* Discipline(s): Major Technical Issue, Ribbon
</div>
</td>
</tr>
</table></div>
== Ribbon Splicing ==
== Ribbon Splicing ==


Line 7: Line 39:




'''Specific Work'''
=== Specific Work ===
#Definition of the factors influencing the splicing viability and final performance of ribbon
#Definition of the factors influencing the splicing viability and final performance of ribbon
#*Rate of splicing
#*Rate of splicing
Line 17: Line 49:
#Experimental demonstration of splicing and test of resulting ribbon
#Experimental demonstration of splicing and test of resulting ribbon


[[Image:Splicing_write_up.odt]] Early and partially obsolete work by Edwards
[[Image:Ribbon_tests.odt]] Early ribbon test by Edwards


<center>
==Ongoing Work==
{| border="1" cellpadding="2"
{| border="1" style="background:transparent;"
|-
|-
|width="500pt"| '''Completed and Ongoing Efforts'''
|width="450pt"|'''[[RibbonSplicing1|Title:Open for Use:]] '''
|-
|width="450pt"|
| [[TBD| Splicing Work by User 1]]
*Lead: Place Name Here
*E-mail: Place E-mail Here
*Focus: Write a brief line or two on what the page is to work on.  This is so other might step up to help.
|}
 
{| border="1" style="background:transparent;"
|-
|-
| [[TBD| Splicing Work by User 2]]
|width="450pt"|'''[[RibbonSplicing2|Title:Open for Use:]] '''
|-
|width="450pt"|
| [[TBD|Splicing Work by User 3]]
*Lead: Place Name Here
*E-mail: Place E-mail Here
*Focus: Write a brief line or two on what the page is to work on.  This is so other might step up to help.
|}
|}
</center>
 
<issues/>

Latest revision as of 21:34, 3 August 2008

Title: Ribbon Splicing

[Cover Img]

About:

  • Moderator: Brad Edwards
  • Created: July 6, 2008
  • Modified: July 25, 2008

Tags:

  • This is a collaborative article
  • Discipline(s): Major Technical Issue, Ribbon

Ribbon Splicing

Building the elevator economically relies on being able to use the elevator to build itself. If we try to launch the entire 1400+ tons for a first small elevator to GEO (or LEO as has been proposed) the cost of the launches runs between $9B and $90B. In addition, there is the cost and complexity of on-orbit construction and the schedule for hundreds of launches. This may be possible with innovative work but we are baselining the construction for launching of the first 40 tons of ribbon and matching counterweight and then sending up climbers to enlarge it. This baseline scenario requires splicing new ribbon to the existing material. The new ribbon is spliced along side the existing ribbon with the interconnects extending over the new and part of the old ribbon. The attachment must be strong and permanent and done at high speed. This arrangement can be seen in the image at right though not to scale.

What needs to get done is a demonstration of the splicing. The basic ribbon design can be used at this point. The baseline scenario calls for tape sandwiches that are put down but there may be better solutions from the textile industry.


Specific Work

  1. Definition of the factors influencing the splicing viability and final performance of ribbon
    • Rate of splicing
    • Tension during splicing
    • Dimensions of ribbon segments
    • Spacing of interconnects to optimize overlap (3x spacing if attachment interconnect overlaps the prior three added ribbons for example)
    • Immediate gripping, UV hardened, cured or ???
  2. FEA model of attached segments in comparison to original ribbon.
  3. Experimental demonstration of splicing and test of resulting ribbon

File:Splicing write up.odt Early and partially obsolete work by Edwards

File:Ribbon tests.odt Early ribbon test by Edwards

Ongoing Work

Title:Open for Use:
  • Lead: Place Name Here
  • E-mail: Place E-mail Here
  • Focus: Write a brief line or two on what the page is to work on. This is so other might step up to help.
Title:Open for Use:
  • Lead: Place Name Here
  • E-mail: Place E-mail Here
  • Focus: Write a brief line or two on what the page is to work on. This is so other might step up to help.

<issues/>