RibbonAttachment: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
(New page: == Ribbon Attachment Mechanism == # Auto tensioning # Spooling out and in) |
No edit summary |
||
Line 1: | Line 1: | ||
== Ribbon Attachment Mechanism == | == Ribbon Attachment Mechanism == | ||
# | At the anchor station the ribbon must be attached in a similar way to how it is held by the climber. It must be held with adjustable tension and be ready to reel in or reel out many miles of ribbon on demand. | ||
# | |||
'''Specific Work''' | |||
# Dynamic modeling of the possible operational scenarios of the ribbon. | |||
#*Climber mounting and ascent - tension abruptly drops and then slowly increases | |||
#*Wind loading and unloading | |||
#*Oscillation damping |
Revision as of 04:47, 9 July 2008
Ribbon Attachment Mechanism
At the anchor station the ribbon must be attached in a similar way to how it is held by the climber. It must be held with adjustable tension and be ready to reel in or reel out many miles of ribbon on demand.
Specific Work
- Dynamic modeling of the possible operational scenarios of the ribbon.
- Climber mounting and ascent - tension abruptly drops and then slowly increases
- Wind loading and unloading
- Oscillation damping