FullBudget

From SpaceElevatorWiki.com
Revision as of 21:51, 12 July 2008 by Edwards (talk | contribs)
Jump to navigationJump to search

Full budget analysis of operations.

Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.

Specific Work

  1. Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
  2. Full cost estimate of the operations of the space elevator
    • Based on a business model generating profits
    • Based on realistic market analysis


Completed and Ongoing Efforts
Budget Work by User 1
Budget Work by User 2
Budget Work by User 3