FullBudget: Difference between revisions

From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary
No edit summary
Line 9: Line 9:
#*Based on a business model generating profits
#*Based on a business model generating profits
#*Based on realistic market analysis
#*Based on realistic market analysis
<center>
{| border="1" cellpadding="2"
|-
|width="500pt"| '''Completed and Ongoing Efforts'''
|-
| [[TBD| Budget Work by User 1]]
|-
| [[TBD| Budget Work by User 2]]
|-
| [[TBD|Budget Work by User 3]]
|}
</center>

Revision as of 21:51, 12 July 2008

Full budget analysis of operations.

Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.

Specific Work

  1. Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
  2. Full cost estimate of the operations of the space elevator
    • Based on a business model generating profits
    • Based on realistic market analysis


Completed and Ongoing Efforts
Budget Work by User 1
Budget Work by User 2
Budget Work by User 3