FullBudget: Difference between revisions

From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary
No edit summary
Line 10: Line 10:
#*Based on realistic market analysis
#*Based on realistic market analysis


<issues/>


<center>
<center>

Revision as of 04:00, 17 July 2008

Full budget analysis of operations.

Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.

Specific Work

  1. Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
  2. Full cost estimate of the operations of the space elevator
    • Based on a business model generating profits
    • Based on realistic market analysis

<issues/>

Completed and Ongoing Efforts
File:SE Financial.ods operational budget by Edwards
File:SEcosts.odt Running costs by Westling
File:SECOST1.ods Construction budget by Edwards
File:SE Cost Breakdown.odt Explanation of construction budget by Edwards