User:Tetherman
From SpaceElevatorWiki.com
Activities for Dave Lang
Date | Time | Tasks | |
---|---|---|---|
2008_Sep_23 | 1.5_hrs | Looking into Ubuntu and open source Fortrans | |
2008-Sep-24 | 0.5 hrs | Communication/Admin; Mac Intel PC Virtual Machine exploration | |
2008-Sep-25 | 1.0 hrs | Getting PC Virtual Machine "VMware Fusion"; Install and set-up configurations | |
2008-Sep-26 | 1.5 hrs | Download and Install Ubuntu; Problems encountered with VMware-Fusion & Ubuntu windows; Looking into changing to Parallels VM for Mac | |
2008-Sep-27 | 3.5 hrs | Download Parallels; Familization with installation and configuration; Identifying choice of Open source Fortran 95; Some Python education | |
2008-Sep-29 | 3.0 hrs | Install Parallels VM on Mac; Exploring Python and Array Pointers | |
2008-Sep-30 | 5.0 hrs | Install and Configure Ubuntu under Parallels; Bringing up Ubuntu desktop; Figuring out VM Ubuntu-to-Mac file transfer procedure. | |
======> End of Pay Period 1: TOTAL Time for SEPT= 16 hrs | |||
2008-Oct-1 | 2.0 hrs | Establishing and testing Ubuntu/GTOSS inter-machine file transfer path options | |
2008-Oct-3 | 1.5 hrs | Move GTOSS source to Ubuntu; Download GNU "g95 Fortran" | |
2008-Oct-4 | 3.0 hrs | Figuring out g95 Fortran installation; Linux System admin stuff | |
2008-Oct-5 | 6.0 hrs | Business Admin; Setting up Fortran installation; Solving configuragtion difficulties | |
2008-Oct-6 | 7.5 hrs | Solved config problem(s), g95 now executes; Dealing w/GNU-vs-Absoft Fortran idiosyncracies; Successful compile of GTOSS; entering Makefile/Config purgatory (but not Hell); Successful "makes" of all GTOSS apps | |
2008-Oct-7 | 4.5 hrs | Brought-up "GTOSS-verification scripts" under Ubuntu; Wrestling with g95 application "segmentation faults"; Exploring Python vers for Mac | |
2008-Oct-8 | 4.5 hrs | Chasing Seg Fault problem. | |
2008-Oct-9 | 6.5 hrs | Seg Fault solved; Ubuntu GTOSS execution verified; Preparing Ubuntu GTOSS install manual; Preparing GTOSS distribution files | |
2008-Oct-10 | 2.5 hrs | Developing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs; Exploring Python Object Oriented features | |
2008-Oct-11 | 3.5 hrs | Preparing Ubuntu GTOSS "Getting Started" manual; Organizing GTOSS Delivery docs | |
2008-Oct-12 | 6.5 hrs | Preparing Ubuntu GTOSS "Getting Started" manual; Setting up Intel-Ubuntu PC | |
2008-Oct-13 | 7.5 hrs | Preparing Ubuntu GTOSS "Getting Started" manual; Exploring g95 compiler for Kubuntu on Intel PC | |
2008-Oct-14 | 9.5 hrs | Preparing Ubuntu GTOSS "Getting Started" manual; Creating sample SE run for users; Installing g95 compiler; porting GTOSS to Kubuntu (text-case hell); GTOSS complex successfully compiled & verified | |
2008-Oct-15 | 2.0 hrs | Preparing Ubuntu GTOSS "Getting Started" manual; Resolved porting-text issue; Creating sample SE run for users; | |
=====> End of Pay Period 2: TOTAL Time for 1 OCT thru 15 OCT = 67 hrs | |||
2008-Oct-16 | 6.0 hrs | Installing OpenOffice; Word->ODT conversion HELL; SE Runs for User delivery | |
2008-Oct-17 | 6.5 hrs | Used Acrobat to do .pdf doc conversions; Finished GTOSS docs for Wiki; Finishing user-run definitions; Python Conversion thoughts | |
2008-Oct-18 | 3.5 hrs | Going over design notes for GTOSS v2; Finished Wiki SE user-run defs; | |
2008-Oct-19 | 6.0 hrs | Added additional SE runs for Users (total of 35 SE runs/descriptions); GTOSS v2 design notes familiarization | |
2008-Oct-20 | 7.0 hrs | Final overview of Ubuntu delivery package; Meeting with Keith | |
2008-Oct-21 | 3.5 hrs | Python familiarization; exploring F2YP | |
2008-Oct-22 | 2.5 hrs | Python familiarization; identified 3 ways to do Fortran-Pyhton-Interface-Generaton(FPIG); Identified winning FGIP | |
2008-Oct-23 | 2.0 hrs | Mercurial familiarization; upgrading Mac Python to 2.5.2; installing Mercurial; | |
2008-Oct-25 | 2.5 hrs | Attempting SS GTOSS repository update; F2Py explorations | |
2008-Oct-26 | 3.0 hrs | Finished SS Archive education!; Trying to find proper PyTables/HDF5 install scheme; | |
2008-Oct-27 | 2.5 hrs | Python familiarization; Python-Fortran testbed development | |
2008-Oct-28 | 3.5 hrs | Python-Fortran test development; Setting up Python/GTOSS development structure; Troubleshooting f2py | |
2008-Oct-29 | 3.5 hrs | Reading f2py References, etc; Re-installed Python-complex, now f2py + everything else works | |
2008-Oct-30 | 1.5 hrs | Successfully generated f2py C-code; Troubleshooting C-library-issues created by f2py C-code wrapper output | |
2008-Oct-31 | 3.0 hrs | Troubleshooting C/Fortran compile library-issues created by f2py C-code wrapper output; C-code makefile issues | |
=====> End of Pay Period 3: TOTAL Time for 15 OCT thru 31 OCT = 56.5 hrs | |||
2008-Nov-01 | 0 hrs | No activity; chill-out contemplating problem! | |
2008-Nov-02 | 0.0 hrs | No activity - chill out, contemplating problem | |
2008-Nov-xx | xx hrs | xxxxxxxxxxxxxxxxxxxxxxxxxxxx | |
2008-Nov-xx | xx hrs | xxxxxxxxxxxxxxxxxxxxxxxxxxxx | |
2008-Nov-xx | xx hrs | xxxxxxxxxxxxxxxxxxxxxxxxxxxx | |
2008-Nov-xx | xx hrs | xxxxxxxxxxxxxxxxxxxxxxxxxxxx | |
2008-Nov-xx | xx hrs | xxxxxxxxxxxxxxxxxxxxxxxxxxxx |