FullBudget: Difference between revisions

From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary
Line 16: Line 16:
|width="500pt"| '''Completed and Ongoing Efforts'''
|width="500pt"| '''Completed and Ongoing Efforts'''
|-
|-
| [[TBD| Budget Work by User 1]]
| [[Image:SE_Financial.xls]] operational budget by Edwards
|-
|-
| [[TBD| Budget Work by User 2]]
| [[Image:SECOST1.xls]] Construction budget by Edwards
|-
|-
| [[TBD|Budget Work by User 3]]
| [[TBD|Budget Work by User 3]]
|}
|}
</center>
</center>

Revision as of 20:27, 13 July 2008

Full budget analysis of operations.

Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.

Specific Work

  1. Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
  2. Full cost estimate of the operations of the space elevator
    • Based on a business model generating profits
    • Based on realistic market analysis


Completed and Ongoing Efforts
File:SE Financial.xls operational budget by Edwards
File:SECOST1.xls Construction budget by Edwards
Budget Work by User 3